Setting up a new home is a daunting task. From interior to plumbing, it takes a lot of effort and time. One of the most time-consuming and tough tasks is plumbing. It impacts from daily convenience to long-term property value. Homeowners often ask how long this process takes. If you are considering this, learning about the time frame before hiring plumbing services in Birmingham is crucial.
What are the Phases of Plumbing Installation?
Primary Stage (Rough-In Phase)
In the first stage, the foundation of the plumbing system is established. In this foundation, components like water supply lines, drainage pipes, and sewer lines are installed. They lay before walls, floors, and ceilings. Typically, this work starts after the frame of the house is built but before any drywall or plastering is applied. In this period, you can expect works like-
- Installation of water supply lines for sinks, baths, showers, washing machines, and toilets.
- Establishment of drainage pipes to remove wastewater safely.
- Building a thorough connection between sewer lines and the main sewage system or septic tank.
- Installation of gas pipes for boilers, water heaters, and cookers.
The exact timeframe varies depending on the size of the house, the number of bathrooms, and the complexity of the work. Larger properties with complex layouts can take several weeks to complete.
Secondary Stage (Installation of Fixtures and Systems)
The first stage sets the tone of the work, and the second stage builds the property. In the primary stage, all the sewerage lines are installed, and in the second stage, they are fitted with key fixtures and connected to the plumbing system. The works include-
- Toilets, sinks, and baths.
- Showers and taps.
- Water heaters and boiler installation.
- Heating components like radiators.
- Other water-related gadgets, such as dishwashers and washing machines.
The plumbers ensure that all the pipes are aligned and the gadgets receive the correct water flow. The timeframe of this work also depends on the project’s size.
Project Complication
After installing the key fixtures, it is all about testing and adding the finishing touches. This stage involves making sure all plumbing fixtures are fully operational. It involves works like-
- The expert connects all fixtures to the main water supply and drainage system.
- They mindfully seal and waterproof all the exposed areas.
- Plumbers offer a thorough check to ensure whether there is any leak.
- They also have proper water flow and heating efficiency.
Factors That Affect Plumbing Installation Timelines
Size and Complexity
If you have a small home with one or two bathrooms, the first stage would take 5 days. Similarly, the second step might take 6 or 7 days.
Type of Plumbing Materials
The choice of plumbing materials significantly affects the time. Materials include copper pipes, PEX, and PVC. Copper pipes require longer installation times due to the need for soldering, compared to other materials.
Plumbing is the basis of any real estate project. Hence, take ample time to build it and hire only professionals to maintain it. If you are wondering whom to connect with for this, connect with us. At BDS Services Ltd, we have a team of professionals dedicated to providing you with the best services. We offer prompt plumbing services in Birmingham, Wolverhampton, Coventry, and nearby areas at the most affordable prices.
Connect with us for a detailed quote now.